Super Word. Geothermal loop hole. And interesting process to watch. After minor difficulties (the unfortunate weather, delays to other nerve site) we went yesterday with the holes go.
arrived at 10:30 a clock, the two-man team from Alpine Energy who perform as a sub for Viessmann the hole. So the three holes A 43 m, to be exact. That was indeed us from the Water Authority due to the geological conditions are specified (instead provided only a hole to 93 m of finger-like house).
However gabs also equal one problem: the appointed container for the overburden was there, but were missing pipes and Verfüllstoff. The then brought at noon by the responsible engineer still after the external supplier had messed up the. Fortunately it had on the progress of work no control.
During a visit this afternoon I caught the boys in their degree of break, so that was time for a little reconnaissance work and background knowledge for me. Very nice workers and mentioned how interesting to watch the whole thing.
Two of the wells had been completed, at the third and last so they just work. According to the both of them are in a good 30 meters encountered water, so that should really optimal conditions prevail later for our heating. We are pleased and excited:)