We wish all our readers - and there are now over 2200 (although we probably about 2000 times on the site were) happy holidays and the fulfillment of your desires. Our - freedom and snow temperatures arbeitstauglichere - seem to still be coming.

We would like to have had such a Christmas (Florida 2003):




















Instead, it now looks like this:















The civil contractors is up to the removal of the "little hills" ready and our bottom plate manufacturers have designed the pigs pink insulation. Fortunately, you do not see the color more later ...









And here comes the introduction of multi-branch it out. The horizontal pipe must already be the cloudy water from the utility room extension to the channel.

Sunday, December 19, 2010

Gonna Kiss A Fool Nose Is Itchy

Sunday, 19:12:10 Winter break ...

... but hopefully only for the weekend. After Friday snow was caused by nothing more work, we had Saturday with our surveyors on site. After nearly 2 hours was the marking out.

Now if the snow is over after miraculously disappears, may tomorrow start with concrete. Or something like that - we are certainly excited.

Here are the pictures from the measurement:

A lone excavator at the excavated hole. Not even Uwe excavated yet. could












No, this is no speed cameras, as the layman my thanks to our professional background, perhaps, but a highly technical reflector to measure.














wars shit cold. But the result was perfect and 28 h later, has set the "client" no cold.

Tuesday, December 14, 2010

What Happen To Denise Milani?

Tuesday, 14:12:10 Not very easily ...

this morning phoned the same time in the city, whether it is right that we deposit the excavated material temporarily on the empty lot. And the almost unbelievable happened: after four years no sow was seriously interested in the spot, now there is an offer that is treated at today's council meeting.

Buyers are naturally not a heap of earth more intently. So once again appealed to the entrepreneur - the excavator operator, however, had already begun, so that now a "little hill" (with 3m Height), the border sheet. The city was so nice that we the rest (much more) on her small green area to the right may stack the entrance - and as quickly as possible away from there again. But that should work.

any case, a lot of excitement, but that the hole is now imposing. Instead, according to the geological survey expected rubble gabs almost only a handful of earth and stones. And a moped, which had its owner (or claws) there disposed of. Built in 1960 according to label - probably the only thing by years of storage in the ground figure out yet.

At least, that should now be with the landfill no longer a problem. A stone in the ground is less equal to a stone fallen from the heart. Tomorrow will be the person responsible for the base. Let's see how the schedule looks like the weather.

by progress are also two pictures:

mighty hill on the city lichen green














And the hole that solidified already busy with ner RĂĽttelplatte is (as well as "wearable" looks like)

Monday, December 13, 2010

Monica Roccaforte All Moves

Monday, 13:12:10 Let's get it started

According to the weather reports we had actually given up hope, but this morning came the relieving call: the excavation work is started. So just finished off and went with all the folders and Lappi.

Shortly before 10 when the starting gun. Three men of the native company DeCandido, including excavators, loaders and vibratory plate compactor. After some preliminary talks went quite fast going. Problems could not wait up, but to Carson was so spot:

was after expected that the utility trench from now until early February, where he is ultimately needed, again collapses, we could initially meet with the municipal utilities of the proposed "open trench" but agree on the installation of conduits. The flight was concerned at the neighboring Union Building (measly € 126 uro).

also were we disagree with the heights, so that our surveyor, who happened to be nearby, had to march again. But we could at least be sure that our house at the end is not a foot too high or low.

also originally been made against the regime ordered the utility does not need the introduction of multi-branch Hauff for water / electricity / telephone. So even as the called and ordered. Let's see if it arrives here in time.

And worse, the last message, that there are problems with the removal of the sediment, as the sub contractor of these conditions will not drive (or only with significant additional cost). Alternatively, the stuff now on the adjacent vacant land held - where we still have to check with the property owners city.

Yesterday we also have on ebay for a cheap Baustromkasten purchased. The electrician who is running for finger building work, had sent (probably because of the distance) offer a horrendous for us. Therefore, we observed the "Baustromkasten market" on ebay for quite some time. The thing is not to the degree corner in Thuringia, but a colleague lives in the area who can pick him up - a happy coincidence.

All in all, a day that probably has as much to be related to mobile phone costs, as usual, a whole month. But at least IT WORKS visible progress:) And here are the pictures

this:

The nearly pristine still life shortly before the arrival of ...












trara ... the backhoe!














First of "snow shoveling" Advanced












for rapid, a first success













And the driveway with carport can think of very imaginative short time

Saturday, December 11, 2010

Spanish Wording For Reply Cards

Saturday, 11:12:10

This week did almost nothing ... unfortunately. Originally advance our civil contractors, dig the hole with gravel and compacted fill. But the snowfall, which last week took us to the geothermal bore already upset by the bill, prevented this, too.

The day is not just start yesterday good to be awakened at 07:00 by the clock radio alarm clock. And in the time it takes to move his arm to kill the alarm, only to hear a sentence: "Our snow-clearing vehicles stuck everywhere. "Simmering falls into place, that is the happy owner of Schneeräumtafel for the property.

Instead of the usual 50-10 minutes 40 minutes Hardcore blades were announced. The fact that such a" record winter "(somehow are only a record winter or summer, if we are to believe the papers), the construction of winter break, be a nuisance, but of course can not be prevented.

Instantaneous stand is that it will Monday start with the excavation. We believe if you take the first vice but they are very very skeptical. And hope that Peter has a show ...

Wednesday, December 1, 2010

Tra Kho Qua Tea Benefits

fear winter Wednesday, 01:12:10 snow delay

After so many people over snow in general and the forward view of "White Christmas" in particular, we must challenge this year: we had hoped for as little cold, and naturally then little snow.

Unfortunately makes Peter a spanner in the works. Last week it looked in the short term, as if our geothermal drilling this week could be carried out. Mr. K from Alpine Energy from Biberach, and we agreed to carry out the three holes tomorrow or the day after. The situation envisaged in the future, we changed terrace towards the street, because damage to the borehole at the upcoming Public Works next week (Peter, we look in your direction, To make this possible) would not have been excluded.

need for the holes the way, we also construction water and electricity. Electricity, we would have got from our neighbors. Construction water we had excluded eigtl as finger house had told us that they would need is 100-200 liters. It was apparently not thought of the geothermal drilling in need, according to Mr K. multiples thereof. So fast yet applied for the connection to the city - with 65 € uro incl water is an absolute bargain.

Other deals this week we have even purchased the Obi: 20% discount thanks gabs ne shower room and cups for children's, valves for Elternbad and a washstand. Despite the special discounted ultimately we have spent € 1,400 uro, but are quite happy with the result.

is hot right now wait and worry if the bottom plate is finished on time. A glance out the window fades to hope. The timing of the first geothermal drilling is in the stars ...