fear winter Wednesday, 01:12:10 snow delay
After so many people over snow in general and the forward view of "White Christmas" in particular, we must challenge this year: we had hoped for as little cold, and naturally then little snow.
Unfortunately makes Peter a spanner in the works. Last week it looked in the short term, as if our geothermal drilling this week could be carried out. Mr. K from Alpine Energy from Biberach, and we agreed to carry out the three holes tomorrow or the day after. The situation envisaged in the future, we changed terrace towards the street, because damage to the borehole at the upcoming Public Works next week (Peter, we look in your direction, To make this possible) would not have been excluded.
need for the holes the way, we also construction water and electricity. Electricity, we would have got from our neighbors. Construction water we had excluded eigtl as finger house had told us that they would need is 100-200 liters. It was apparently not thought of the geothermal drilling in need, according to Mr K. multiples thereof. So fast yet applied for the connection to the city - with 65 € uro incl water is an absolute bargain.
Other deals this week we have even purchased the Obi: 20% discount thanks gabs ne shower room and cups for children's, valves for Elternbad and a washstand. Despite the special discounted ultimately we have spent € 1,400 uro, but are quite happy with the result.
is hot right now wait and worry if the bottom plate is finished on time. A glance out the window fades to hope. The timing of the first geothermal drilling is in the stars ...