Saturday, 19:02:11 Well, who still digs so late ...

... on utility hole, which is Carsten - and he still swears. Or so can describe the last week. Blades to the hilt, so that the city works to create electricity, telephone and water into the house.

The lesser problem was the electrical system. As agreed, I pulled the department of public utilities on Monday its two cable through the conduits and the introduction of luxury multi-genre called "Basic" by Hauff in the laundry room. No problem Alf would say.

Things were different with the W-section: "the hole is not wide enough for two." It is also one of the workers move somewhat limited, so it will again be roomier. Finally, after 20 hours felt dig, probably also a wheelchair user would have been comfortable place.

on Thursday could therefore also the wiring of the (construction) carried water in the laundry room. Hurrah.

The cables and cable had now eingesandet and the gap to be filled again. Carsten had to organize semi-professional help from his brothers. The three of went much faster than alone.

then continued for the underground cable for future power supply in the garage / carport was verbuddelt. If the men "warm shoveled" ever are, you have to exploit the same.

Finally, the satellite dish be installed. Can not last so long, thought the owner. Has so many years ago at home somehow worked. However, unfamiliarity is pottering on the roof, even if a framework for protection. yes a few meters to the bottom.

Even the cable through the roof rafter bracket Kathrein proved much more demanding than intended. Then the stubborn cable with a lot of persuasion well and be followed by more cursing at the LNB. Nero Ahead is two hours around. And the most at about 2 degrees Celsius without pause roof. This is the official is not used (and righteous and the non-working brother).

the evening was at least a partial success can be reported: Bowl is, wires are connected. Only a few "little things" - no sound and picture on TV and probably no signal - must be corrected in the next few weeks. But it will come.

Next week the plumbing he come back, but probably still no return of the electrician to the current site electricity to temporary connection (with regular power) switch. Mainly works the front of the screed drying (in the few cents more to defeat the evil site electricity would book), but we are confident.

Here are some pictures:

A little chaos in the dining room during a visit to the sanitation people. Let's see if there in a couple of years looks like ... but Karin will know how to prevent it anyway?











A Bad Image, as the drains were installed











And this is an unprofessional screed lock on a shower tray - it includes the inclined Readers: builders performance









One of the hopefully rare occasions, our heat pump (Viessmann Vitocal 343) to see open. Somewhere and 220 liters of water fit inside















And the behind-the Vitocal. Actually, we wanted somewhere to hang a couple of storage shelves. Time to consider where we place yet.














The apparently preferred wardrobe version of finger-house (after we had noticed in another blog so)









The family
Buddelkolonne in use in the laying of underground cable












And the current stand mount the dish but is now installed in the south - was marked on the map on the west roof. But good for us Sun Now she has to transmit signals only at some point.